Huizhou Hazardous Waste Incineration Plant

Huizhou

The Huizhou Hazardous Waste Incineration Plant is designed for 100,000 tons per annum capacity. The facility provides waste incineration through a dedicated high temperature chemical waste incinerator.  The facility is also fully equipped with a laboratory to test and analyze all waste intakes before, during and after treatment at the facility.

The facility also includes oil/water separation and biological treatment system, recovery of water, oil, energy and copper oxide from the treatment process.

VL Automation Limited (VL)’s responsibility included system configuration, Human Machine Interface and control logic development, testing & commissioning as well as training.  VL is a direct contractor to the Veolia Environmental Services Ltd.

Project Details

View More Projects